(1)
A Analysis of Preventive Maintenance Schedule of Xym1900 Vertical Roller Mill Crusher Machine Using MTBF (Mean Time Between Failures) Method Based on RCA (Root Cause Analysis). ITEJ 2025, 10 (1), 78-92. https://doi.org/10.24235/itej.v10i1.205.